Recent Bathroom Project

Here is a full bathroom re-fit carried out recently.

 

Starting with a blank canvas as the customer had had the room emptied and re-plastered. Firstly the floor boards were removed to allow all plumbing work to be concealed and to allow for some strengthening of the joists before the new floor boards where laid and a layer of plywood laid over that.

Bathroom Start 

Bathroom re-boarded

A shower enclosure and base were built to provide a spacious shower area with twin shower heads,

Shower framework

the corner of the room was boxed out to allow the toilet to be positioned at an angle

Toilet boxed in

and a section of the wall where the bath was to be fitted was also boxed out to provide a shelf area behind the bath and to allow for the plumbing for the bath filler.

Bath Boxed in

Also a new large radiator panel was fitted to heat the area.

New Radiator

 The shower enclosure was then fully tanked using a waterproof membrane,

Tanked shower enclosure

then the basin and mirror were fitted and the tiling was completed.

Sink tiled splashback 

Shower screen 

Tiled Shower enclosure 

Tiled bath Back 

Large radiator

My work here is now complete and the finishing touches were being carried out by the customer.

 

 

 

 

tiler bolton, tiling bolton, tiler, tiling, bathrooms, wetroom, wetrooms, bathroom design, wetroom design.