Bathroom refurb to include wetroom shower area

The brief this time was to re-fit a bath, toilet and basin but to also include a wetroom shower area.

 

The room was only partially tiled and mostly wall papered, so the first job was to strip out everything and get the area prepared.


The new shower area was prepared and then tanked.

And the new low level steel bath was installed .

The room was then fully tiled and the rest of the fixtures installed including a tiled bath panel.


 

And finally a new door was fitted to the boiler cupboard.

 

 

 

 

 

tiler bolton, tiling bolton, tiler, tiling, bathrooms, wetroom, wetrooms, bathroom design, wetroom design.